Residents in two communities within the Guanacaste province of Costa Rica will experience planned power outages on Tuesday, June 16th. The Instituto Costarricense de Electricidad (ICE), the state-owned electricity provider, is conducting necessary maintenance work on the electrical grid. Specific zones affected and the corresponding outage schedules have not been detailed in this initial report, but residents are advised to prepare for interruptions. The ICE routinely performs maintenance to ensure the reliability of the power supply. Further information regarding affected areas and precise timings is expected to be released by the ICE. These outages are planned and intended to improve the long-term stability of the electrical infrastructure in Guanacaste.
